LoomOS Off track

Health score 40/100 · 26 overdue, forecast past target, 3 unowned · last activity 6m ago

Progress0%
Open260 in progress · 26 to do
Overdue260 due in 7d
Blocked / stalled0 / 0
Velocity0/wk0 done this week
Forecast finishNo throughput yettarget 27 Oct

Status breakdown

to do 26

Lists

7 lists
ListProgressOpenIn progressTo doOverdueBlockedStalledDoneTeamActivity

Needs attention

Team load

  • AS Arshpreet Singh 5 open · 0 active · 5 late
  • C Chetna 5 open · 0 active · 5 late
  • SS Sukriti Singh 5 open · 0 active · 5 late
  • AS Adarsh Saxena 4 open · 0 active · 4 late
  • AP Avinash Pratap 4 open · 0 active · 4 late

Throughput · 14 days

Created 26 Completed 0
19 Oct26 Oct2 Nov9 Nov16 Nov23 Nov30 Nov7 Dec
In progress To do Blocked Overdue Done Due date only / milestone

Open tasks

TaskStatusPriorityAssigneeDueUpdated
to do 26
[P0] Confirm open questions with Indo before building
Indo PoC · Home & dashboards
to do Urgent AS 1d overdue 6m ago
MIS plan vs actual: seven lines with monthly manual entry and month-end forecast
Indo PoC · Home & dashboards
to do High AS 1d overdue 6m ago
Home row 2: Why we miss (losses in minutes, parts and ₹, plus corrective actions)
Indo PoC · Home & dashboards
to do High AS 1d overdue 6m ago
Home row 1: Production now (target vs actual, projection, status, ranked lines)
Indo PoC · Home & dashboards
to do High SS 1d overdue 6m ago
Home: shared filter bar (period, line, product, shift) and window label on every card
Indo PoC · Home & dashboards
to do High C 1d overdue 6m ago
Corrective action log (shared by Home, D2 and D7)
Indo PoC · Home & dashboards
to do High AS 1d overdue 6m ago
Full operations list for the line, including manual stations with manual counts
Indo PoC · Home & dashboards
to do High AS 1d overdue 6m ago
Plan from Indo takt method (net time, allowances, manpower efficiency)
Indo PoC · Home & dashboards
to do High AS 1d overdue 6m ago
Indo loss categories (fixed and variable) in the stop reason catalog
Indo PoC · Home & dashboards
to do High AP 1d overdue 6m ago
[P0] Home: replace 'On-time order outlook' with order attainment and on-time risk
Indo PoC · Home & dashboards
to do High AP 1d overdue 6m ago
[P0] Home: replace 'Cost per unit this week' with cost per part by product and cost as % of sales
Indo PoC · Home & dashboards
to do High SS 1d overdue 6m ago
[P0] Remove invented OEE fallbacks (85% / 90% / 95% / 99%) on Home line and machine cards
Indo PoC · Home & dashboards
to do High Unassigned 1d overdue 6m ago
[P0] Home: Plant OEE must use the same weighted line-end definition as D2
Indo PoC · Home & dashboards
to do High SS 1d overdue 6m ago
[P0] Write one definition per Home metric (docs/metrics.md)
Indo PoC · Home & dashboards
to do High SS 1d overdue 6m ago
Home row 4: Quality (first time right, good / rework / reject, COPQ)
Indo PoC · Home & dashboards
to do Normal C 1d overdue 6m ago
Home row 3: Efficiency and productivity (weighted, trend, machine and operator summaries)
Indo PoC · Home & dashboards
to do Normal AS 1d overdue 6m ago
Home: headline sentence generated from the numbers
Indo PoC · Home & dashboards
to do Normal Unassigned 1d overdue 6m ago
[P0] Home: OEE loss in ₹, use the filter window and show costing coverage
Indo PoC · Home & dashboards
to do Normal Unassigned 1d overdue 6m ago
D7 Actions: rank by ₹, owner and status, shared action log, new kinds, window on each item
Indo PoC · Home & dashboards
to do Normal AP 1d overdue 6m ago
D6 Quality & WIP: trends, breakdowns, output split, COPQ, real dispatch and held-part ageing
Indo PoC · Home & dashboards
to do Normal C 1d overdue 6m ago
D5 Cost: fix spend period logic, MIS lines, cost per part by product, loss cost, comparisons, ROI
Indo PoC · Home & dashboards
to do Normal C 1d overdue 6m ago
D4 Consumables & spares: time-to-change forecast, achieved vs standard life, cross-cell comparison, cost per part
Indo PoC · Home & dashboards
to do Normal AP 1d overdue 6m ago
D3 People: gap reasons, authorised vs required, manhours and productivity, time discipline
Indo PoC · Home & dashboards
to do Normal AS 1d overdue 6m ago
D2 OEE & losses: shared OEE definition, takt plan, Indo categories, hourly reasons, trends, shift filter
Indo PoC · Home & dashboards
to do Normal SS 1d overdue 6m ago
D1 Process flow: all operations, takt / capacity, forecast and ₹, leakage, next consumable
Indo PoC · Home & dashboards
to do Normal AS 1d overdue 6m ago
Home rows 5–6: Money (MIS + orders) and Decide (top 5 actions by ₹); final Home layout
Indo PoC · Home & dashboards
to do Normal C 1d overdue 6m ago

Recently completed

  • Nothing completed recently.

Activity

Today
Updated